Inspection Report Reader logo — a house frame with a checkmark at its peakInspection Report ReaderWhat the words in a Texas inspection report mean
Topic hub · 3 guides

From report to repair request: what a Texas buyer does with the findings

The report is evidence. What it is worth depends on what the buyer does with it before the option period ends.

The short answer

A Texas inspection report obliges no one to do anything. The REI 7-6 preamble says items marked Deficient do not obligate any party to make repairs, and that the decision to correct any hazard or deficiency is left to the parties to the contract. What turns findings into action is the buyer's contract, usually the TREC One to Four Family Residential Contract (Resale), TREC No. 20-19, mandatory since July 1, 2026. Its option period gives the buyer an unrestricted right to terminate for a fee, and its repair provisions govern any repairs the seller agrees to on the TREC Amendment to Contract, TREC No. 39-11. The work in between is the buyer's: sorting findings, getting further evaluation and estimates, and deciding whether to ask for repairs, a price change, or to leave.

Four decisions, in order

What is missing from the report? List the Not Inspected items and stated limitations, and decide which gaps need filling.

What needs a specialist? List the recommendations for further evaluation, and book the right professionals at once. The preamble says that is the client's responsibility, before the option period expires.

What matters to this buyer? Sort findings into hazards, major systems and minor items. Age-related comments such as end of useful life are budgeting signals rather than repair items.

What to ask for? Specific repairs, a price or credit, or nothing, with termination as the alternative if agreement is not reached in time.

The clock

Paragraph 5 of the 20-19 contract sets the option period: a number of days after the Effective Date, with notice of termination due by 5:00 p.m. local time on the last day, and time of the essence. The inspector has up to two days to deliver the report after the inspection when paid in advance, unless the client agrees otherwise in writing. Evaluations take time to schedule. A buyer who starts late can run out of days. See the option period and the report.

The paper

Agreed repairs go on the Amendment to Contract. The contract asks for specific repairs rather than general phrases, and paragraph 7F requires agreed repairs to be completed before closing by licensed persons where a license is required, with permits where needed, documentation of scope and payment, and transfer of transferable warranties. See writing a repair request.

The people

The inspector explains the report. Licensed trades and engineers evaluate conditions and give estimates. The agent or attorney handling the contract advises on the contract. Each has a different role, and TREC's rules keep the inspector out of the repair work: an inspector may not accept repair work on systems the inspector inspected for the transaction within 12 months. See who does further evaluation.

A note on timing

The order above matters more than speed alone. Gaps and recommendations take longest to resolve, because they depend on other people's schedules, so they come first even when the Deficient list looks more urgent. A buyer who reaches the last day of the option period with an evaluation still outstanding has two choices: negotiate an extension, or decide without the information.

Guides in this section

The option period and the report explains the deadline and how the report fits it. Writing a repair request covers the amendment form and what the contract requires of repairs. Who does further evaluation matches recommendations to the right licensed professional.

Where the rules come from

The contract is TREC form 20-19, effective July 1, 2026 per TREC's form page. The amendment is TREC form 39-11. The preamble is on form REI 7-6. Report delivery is 22 TAC 535.222, and inspector conduct is 22 TAC 535.220. This is general information, not legal advice.

Frequently Asked Questions

Does the inspection report require the seller to repair anything?

No. The form states that Deficient items do not obligate any party to make repairs.

What form is used to agree repairs?

The TREC Amendment to Contract, TREC No. 39-11, for contracts on TREC forms.

Can I terminate because of the inspection?

During the option period, the buyer has an unrestricted right to terminate under paragraph 5 of the 20-19 contract, if the option fee was delivered on time. No reason is required.

Should I ask for a price reduction instead of repairs?

That is a negotiating choice. The amendment form provides for both. Ask your agent or lender how a price change affects your financing.
In depth

The 3 from report to repair request guides


How the report fits the option period, how a repair request is written on the TREC amendment, and which licensed trade does each kind of further evaluation.