The short answer
A Texas inspection report obliges no one to do anything. The REI 7-6 preamble says items marked Deficient do not obligate any party to make repairs, and that the decision to correct any hazard or deficiency is left to the parties to the contract. What turns findings into action is the buyer's contract, usually the TREC One to Four Family Residential Contract (Resale), TREC No. 20-19, mandatory since July 1, 2026. Its option period gives the buyer an unrestricted right to terminate for a fee, and its repair provisions govern any repairs the seller agrees to on the TREC Amendment to Contract, TREC No. 39-11. The work in between is the buyer's: sorting findings, getting further evaluation and estimates, and deciding whether to ask for repairs, a price change, or to leave.
Four decisions, in order
What is missing from the report? List the Not Inspected items and stated limitations, and decide which gaps need filling.
What needs a specialist? List the recommendations for further evaluation, and book the right professionals at once. The preamble says that is the client's responsibility, before the option period expires.
What matters to this buyer? Sort findings into hazards, major systems and minor items. Age-related comments such as end of useful life are budgeting signals rather than repair items.
What to ask for? Specific repairs, a price or credit, or nothing, with termination as the alternative if agreement is not reached in time.
The clock
Paragraph 5 of the 20-19 contract sets the option period: a number of days after the Effective Date, with notice of termination due by 5:00 p.m. local time on the last day, and time of the essence. The inspector has up to two days to deliver the report after the inspection when paid in advance, unless the client agrees otherwise in writing. Evaluations take time to schedule. A buyer who starts late can run out of days. See the option period and the report.
The paper
Agreed repairs go on the Amendment to Contract. The contract asks for specific repairs rather than general phrases, and paragraph 7F requires agreed repairs to be completed before closing by licensed persons where a license is required, with permits where needed, documentation of scope and payment, and transfer of transferable warranties. See writing a repair request.
The people
The inspector explains the report. Licensed trades and engineers evaluate conditions and give estimates. The agent or attorney handling the contract advises on the contract. Each has a different role, and TREC's rules keep the inspector out of the repair work: an inspector may not accept repair work on systems the inspector inspected for the transaction within 12 months. See who does further evaluation.
A note on timing
The order above matters more than speed alone. Gaps and recommendations take longest to resolve, because they depend on other people's schedules, so they come first even when the Deficient list looks more urgent. A buyer who reaches the last day of the option period with an evaluation still outstanding has two choices: negotiate an extension, or decide without the information.
Guides in this section
The option period and the report explains the deadline and how the report fits it. Writing a repair request covers the amendment form and what the contract requires of repairs. Who does further evaluation matches recommendations to the right licensed professional.
Where the rules come from
The contract is TREC form 20-19, effective July 1, 2026 per TREC's form page. The amendment is TREC form 39-11. The preamble is on form REI 7-6. Report delivery is 22 TAC 535.222, and inspector conduct is 22 TAC 535.220. This is general information, not legal advice.