Inspection Report Reader logo — a house frame with a checkmark at its peakInspection Report ReaderWhat the words in a Texas inspection report mean
How to read the report

The preamble pages: what the first pages of every Texas inspection report say

Most buyers skip the opening pages of their report. They are the state's own instructions for reading everything that follows.

The short answer

Every Texas inspection report on form REI 7-6 opens with the same standard text, written by the Texas Real Estate Commission (TREC) and reproduced word for word by every inspector. The rule requires it: under TREC rule 535.223, a report produced by software must reproduce the form's text exactly. Those opening pages, often called the preamble, set out what an inspection is, what the inspector must and need not do, what the client must do, what the report cannot tell you, and how older-house hazards are treated. They are the key to the rest of the report, and they are the same in every Texas report, which makes them worth reading once with care.

Purpose of the inspection

The preamble begins by defining the job. A real estate inspection is a visual survey of a structure and a basic performance evaluation of its systems and components, which provides information on their general condition at the time of the inspection. It asks the reader to read all of the information in the report and to ask the inspector to clarify anything that is unclear.

That single paragraph sets three limits that run through every page: the inspection is visual, the performance check is basic, and the information describes one day. Each has its own page on this site: limited visual survey and at the time of the inspection.

Responsibility of the inspector

The preamble then states what the inspector is required to do, by reference to TREC's standards of practice. The inspector must use the form, inspect only those components and conditions that are present, visible and accessible at the time of the inspection, indicate whether each item was inspected, not inspected or not present, mark an item Deficient when it meets the definition, and explain findings in the body of the report.

It also lists things the inspector is not required to do: identify all potential hazards; turn on decommissioned equipment, systems or utilities, or light pilot lights; climb over obstacles or move furnishings or stored items; prioritize or emphasize one deficiency over another; provide follow-up services to verify that repairs were made; or inspect the optional systems unless the client asked for them. The full list of general limitations appears in TREC's rules; see what Texas inspectors are not required to do.

Responsibility of the client

This is the paragraph with the most practical weight, and it contains the line most buyers miss. It says, in capital letters in the form, that items identified as Deficient do not obligate any party to make repairs or take other actions.

It then places three duties on the client. If further evaluation is needed, the client must obtain it, along with cost estimates, from qualified service professionals. That evaluation should be done before any contractual time limitations, such as option periods, expire. And the client should understand that those professionals may find additional deficiencies that were not visible at the time of the inspection. The paragraph closes with a warning that repairs made after the inspection may render information in the report obsolete or invalid.

Read together, the paragraph tells a buyer that the report is evidence, that acting on it is the buyer's job, and that the clock is the buyer's contract. See recommend further evaluation and the option period and the report.

Report limitations

The limitations paragraph says the report is provided for the benefit of the named client and reflects observations on the date of the inspection. It states that only those items specifically noted as being inspected on the report were inspected. It says the inspection is not technically exhaustive and may not reveal all deficiencies, that it is not a code-compliance inspection or an inspection against manufacturer's installation instructions, and that it does not imply insurability or warrantability of the structure or its components.

Each of those sentences answers a question buyers often ask after closing. Was the item inspected? Only if the report says so. Does the house meet code? The report does not say. Will the insurer cover the roof? The report does not imply it. See code violations and the inspection report.

The notice about hazards and older houses

The preamble includes a notice concerning hazardous conditions, deficiencies and contractual agreements. Its first part explains that conditions acceptable when a house was built may now be considered hazardous, are not necessarily required to be updated, but must be reported as Deficient if present and posing a significant risk. It lists examples, from missing GFCI and AFCI devices to ordinary glass where safety glass is now expected and lack of bonding on gas piping. See conditions not required to be updated.

The notice then says that the decision to correct a hazard or any deficiency is left to the parties to the contract.

Additional information and contract terms

Finally, the preamble explains that information under "Additional Information Provided by Inspector", or attached to the report, is not required by the Commission and may contain contractual terms between the inspector and the client, which the Commission does not regulate. The form tells readers to consult an attorney if they do not understand any of those terms. Under TREC rule 535.223, an inspector may include a service agreement or contract terms in that section or as an attachment, and may attach supplemental pages after the standard form.

That means the section after the standard pages can contain anything from a helpful summary to limitations of liability. It is worth reading as carefully as the findings.

Why the preamble is the same everywhere

TREC rule 535.223 lets inspectors change the typeface, the colors, the logo, the page size and the cover page, add headers and footers, add comment space and attach pages. It does not let them change the standard text. A buyer who has read the preamble once has read it for every Texas report.

Common mistakes

Skipping it as boilerplate. It is boilerplate in the literal sense, and that is why it matters: it is the fixed frame every finding sits inside.

Missing the client's responsibility. The duty to get further evaluation before the option period ends sits on the buyer, in the form's own words.

Missing the contract terms. Additional pages can contain terms of the inspection agreement that limit remedies. Read them, and ask an attorney if needed.

Where the rules come from

The preamble is part of form REI 7-6. The requirement to reproduce it exactly, and the permitted changes, are in 22 TAC 535.223. The standards it refers to are 22 TAC 535.227 through 535.233.

Frequently Asked Questions

Can an inspector change the preamble text?

No. TREC's rule requires software-generated reports to reproduce the form's text exactly. Inspectors may change formatting, logos and cover pages, and add pages after the standard form.

What does the preamble say about repairs?

That items marked Deficient do not obligate any party to make repairs, and that the decision to correct hazards or deficiencies is left to the parties to the contract.

Who has to arrange further evaluation?

The client, according to the preamble, and before contractual deadlines such as the option period expire.

What is the "Additional Information Provided by Inspector" section?

Optional content the Commission does not require, which may include contract terms between inspector and client. TREC does not regulate those terms; the form advises consulting an attorney if they are unclear.